SIGNAL SCHOOL FMRS TAJI 2005

PHASE 5 BSU TAJI 2004-2005
January 2, 2017
NORTH DEPO NORTH BAGHDAD 2006
January 2, 2017

Client: Washinton Group
Date: 2005
Location: Taji – Iraq

SIGNAL SCHOOL FMRS  TAJI 2005

 

F.CO GROUP construct Sewage Water System. The following works includes:

  • Install pipes (5,000 m).

  • Install 250 manholes.

  • Install 5 lift station.

  • Pressure Lines