Client: Emec
Date: 2004 – 2005
Location: South Baghdad – Iraq
PHASE 5 BSU TAJI 2004-2005
F.CO GROUP constructed, supplied and installed the following items for Academy of Iraqi Army.
Sewage Water Pipes (5,000 m).
Potable Water Pipes (5,000 m).
Two Pond for Water (500,000 liter) each.
Two Play yards.
Installing Vehicles Sunshades.