PHASE 5 BSU TAJI 2004-2005
January 2, 2017NORTH DEPO NORTH BAGHDAD 2006
January 2, 2017 Client: Washinton Group
Date: 2005
Location: Taji – Iraq
SIGNAL SCHOOL FMRS TAJI 2005
F.CO GROUP construct Sewage Water System. The following works includes:
-
Install pipes (5,000 m).
-
Install 250 manholes.
-
Install 5 lift station.
-
Pressure Lines