SADIR CITY 2005
January 2, 2017SIGNAL SCHOOL FMRS TAJI 2005
January 2, 2017 Client: Emec
Date: 2004 – 2005
Location: South Baghdad – Iraq
PHASE 5 BSU TAJI 2004-2005
F.CO GROUP constructed, supplied and installed the following items for Academy of Iraqi Army.
-
Sewage Water Pipes (5,000 m).
-
Potable Water Pipes (5,000 m).
-
Two Pond for Water (500,000 liter) each.
-
Two Play yards.
-
Installing Vehicles Sunshades.