WORK-OVER ZB#101- 2015
January 17, 2017MANUFACTURING SKIDS BHI 2015
January 17, 2017 Client: BHI / Lukoil
Date: March 2015
Location: Iraq
CONSOLIDATION CLUSTER # 5
This is one of the waste management job sites, after drilling took place and the rig have left the job site after finishing its job. The main task can be achieved by inheriting he remnant cutting and solid waste and mix with a suitable amount of cement. First get small amount of the mixture ( cutting and the cement) to ensure the correct volume of the cement with the cutting will be solid enough. Once the volume determined the mix will take place by using a long arm excavator, by finishing this procedure the waste pit shall back filled by soil and compacted/leveled. Then a sand berm will be make it will be approximately one meet high around the waste pit. Other activities must be taken like housekeeping for the rest of the job site cleaning the well head cleaning the channels in the concrete pads, cleaning the cellar pit from the waste and any solid waste also if any oil spill or garbage will be taken out of the job site.