WASHINGTON GROUP LIFE SUPPORT 2019-2010
January 2, 2017URS BURN PIT ENVIRONMENT PROJECT (JBB 2010-2011)
January 2, 2017 Client:Corps of Engineers
Date: 1/12/2010 – 1/12/2012
Location: Baladiat Baghdad – Iraq
BALADIAT BAGHDAD 2010
Baladiat 2010 Constructing GDCT project which consists the following:
-
Five story building 2430m2 each story
-
Four story building 1150m2 each story
-
Two ablution buildings 150m2 each building
-
Two barracks buildings two story 280m2 each story
-
One reception building 150m2.
-
Fuel station with fuel storage tanks
-
Electricity power generating station with 4 (1.5 megawatt) generators
-
In addition of the infrastructure for row water, waste water and power in the compound