WORK-OVER ZB#109- 2015
January 17, 2017CONSOLIDATION CLUSTER #5 – 2015
January 17, 2017 Client: Oilserv / ENI
Date: June 2015
Location: Iraq
WORK-OVER ZB#101- 2015
F.CO GROUP is proudly to provides civil works for the work-over job sites. To prepare the yard of the drilling rig, the job will be grading, leveling, adding sub-base and compaction for the ground. Constructing new water well, constructing sand berm (or repair if it exists) constructing new waste pit, new mud pit (or repair if exists), casting concrete pad for the rig (or modify to match the rig base and other activities)